Reduce Energy Costs of Industrial Heat Pump Systems

Improve the performance of your industrial heat-pump systems through waste-heat integration, source-side optimization and process engineering.

Preview of the technical publication
Further information Available after technical review and direct consultation with ZCT.
Technical publication

Lower Operating Costs - increased Heat Pump Performance.

The publication examines how source-side temperature, heat variability and process integration influence COP and electrical demand in industrial heat-pump systems.

Operating challenge

Improve your systems performance

Heat-pump performance depends on the complete thermal system - not only the installed machine. Source temperature, sink requirements, operating profile and waste-heat integration determine the achievable efficiency.

Variable source conditionsWaste-heat quality and availability can shift with plant operation.
High electrical demandUnfavourable temperature lift increases compressor input.
System-level constraintsCOP depends on the complete installation, not only the heat pump.
ZCT approach

From assessment to optimized performance

The initial assessment and client alignment define the technical scope and project requirements. Following formal commissioning, ZCT can manage the complete optimization process—from planning and detailed engineering to integration, implementation support and operational optimization.

01

Assess

Capture operating data, temperature profiles, current COP, available waste heat and project requirements.

02

Plan

Develop the thermodynamic concept, simulate operating scenarios and define the engineering and optimization measures.

03

Integrate

Deliver detailed engineering, project management, system integration, implementation support, commissioning and performance optimization.

Pre-feasibility screening

Heat Pump Optimization Assessment

Provide the key operating data for an initial technical screening. We'll get in contact as soon as possible!

Indicative operating screen

Estimate your optimization potential

Current COP
Indicative optimized COP
Indicative energy cost reduction
Funding Evaluation

Where applicable, ZCT can evaluate relevant Austrian and European funding opportunities as part of the subsequent project development.

Indicative pre-feasibility screening. Final performance depends on refrigerant, compressor arrangement, source and sink profiles, pinch temperatures, part-load behaviour and manufacturer data.

Email confirmation required

After submitting the form, you will receive an email with a confirmation link. Your assessment request will only be forwarded to ZCT after your email address has been confirmed.

If you do not receive the email within 30 minutes, please check your spam folder or contact us directly at pm@zero-carbon.at.